Every scope.
In technical detail.

Choose an application and explore its layout, section and key connections. Seven applications, each with its own model.

These concepts show installation scope and points to agree with the designer. We adapt dimensions and parameters to the project documentation.

Plan of an illustrative 12 by 8 metre IT zone, with 12 racks, a cold aisle, a separate entrance and a panel envelope

A-01 · Rack layout, equipment fronts, access, partitions and section A–A location.

Download the SVG sheet

Demonstration concept. Dimensions are model assumptions, not standard requirements. A specific project requires system selection and coordination between disciplines.

What do we agree before installation?

Layout and access
Equipment dimensions, rack door opening, component replacement, transport and exit routes. The plan separates the IT room from the entrance zone.
Equipment operating environment
In the example, rack fronts face the cold aisle. Appropriate temperatures, humidity and cooling follow the equipment requirements and HVAC design, including when liquid cooling is used.
Continuity of the enclosure
Walls, connections to the slab and floor, doors and penetrations form one system. An EI classification cannot be selected from panel thickness alone.
Structural and services coordination
Suspensions, supports, slab movement and openings must be agreed before installation. Panel facings alone are not a default support for service routes.

What do we show
within Panel Montage’s scope?

The sandwich panel envelope, partitions, connections and flashings within the agreed documentation scope. These are highlighted in blue on the sheets.

Send your envelope design

Elements to coordinate

IT racks, cooling, power, service routes, detection and fire suppression, access control and aisle containment remain separate scopes. We coordinate door openings and penetrations with the relevant trades.

A diagram does not establish fire resistance, cleanliness classification or certification. Selection is specific to the configuration and project.

Basis of the study

Manufacturer materials and industry sources used to develop this scope. Model dimensions are our own demonstration assumptions.

  1. Schneider Electric — Data Center Projects: Establishing a Floor Plan, WP 144 Rev 2

    A-01 and A-02: opposing rack fronts and maintenance aisles; original geometry, not copied drawings.

  2. ASHRAE Handbook 2023 — Data Centers and Telecommunication Facilities

    No universal temperature or humidity is specified. Only an air-cooling example is assumed.

  3. Kingspan — Installation guide, Walls & ceiling, Nordics

    Panel layers, support, openings and independent suspensions. Fixing dimensions have not been applied to an unspecified product.

  4. Kingspan — Fire Resistance of Insulated Panels

    No invented EI classification or assignment to a specific Kingspan model. Reaction to fire is not the same as fire resistance.

  5. Hilti / Paroc Panel System / Rf-Technologies — Firestop in sandwich panels

    P1 is a coordination interface; no Hilti/Paroc detail is marked as compatible with Kingspan.

  6. Uptime Institute — Tier Certification

    No Tier III/IV or other rating is assigned to the envelope diagram.

Seven envelope installation scopes

Select a scope and compare its connections with your project documentation. The sheets show concepts, not construction documents or technical specifications.

Cold stores

An envelope that connects insulated walls and ceiling with the floor, doors and refrigeration system. The plan shows access to the room, the section shows layer continuity and the details show key interfaces.

Panel Montage scope: Installation of the panel envelope, connections and flashings within the scope agreed for the project.

To agree with other trades: Responsibilities must be allocated for the floor, refrigeration, suspension structure, door selection and controls. The diagram does not imply that PM supplies all these systems.

Open model: Cold stores

Freezer rooms

A freezer room envelope must also be coordinated with ground protection, heated door frames and pressure equalisation. A separate model shows where these systems meet the sandwich panels.

Panel Montage scope: The freezer room panel envelope, interfaces and openings in accordance with the project documentation.

To agree with other trades: H1 ground protection, H2 frame heating, V1 pressure equalisation, refrigeration and controls are separate scopes to coordinate. We do not assign them to PM without a separate agreement.

Open model: Freezer rooms

Cleanroom

A smooth cleanroom envelope with clearly separated personnel and material access. The drawings show airlocks, the ceiling, hygienic junctions and service coordination points.

Panel Montage scope: Panel envelope, system connections and finishes, plus openings coordinated with the project’s process design.

To agree with other trades: Process design, HVAC, filtration, pressure balance and cascade, door interlocks, services, floor and validation require separate agreements. PM does not declare a cleanliness class based on the envelope alone.

Open model: Cleanroom

Discuss your project’s envelope scope